It seems one mover always was extremely liked by the rest of the boys and had him help them every time an extremely heavy item was needed to be moved upstairs..
The fridge was very important and needed all involved to get it going.
Water works and everything..
The boys were so excited to get new rooms and furniture. Luckily they found all the pieces necessary to put the beds together. (thought the Cannery was in real trouble)The boys were so helpful ..This mover put his whole body into it. What a guy.
And finally an end to Riley's day. He was exhausted when we had dinner.
Now what the men were waiting for was the elk at the Elk station near Natches. It was amazing and must have had over 400 of them there. Sandy and I stayed in the truck it was too cold. http://wdfw.wa.gov/lands/r3oakcrk.htm
And finally an end to Riley's day. He was exhausted when we had dinner.
Now what the men were waiting for was the elk at the Elk station near Natches. It was amazing and must have had over 400 of them there. Sandy and I stayed in the truck it was too cold. http://wdfw.wa.gov/lands/r3oakcrk.htm
No comments:
Post a Comment